What's new
Meetings
Latest Energy Accounts
 Mechanism for Compensation for Degradation of Heat Rate, Aux Consumption and Secondary Fuel Oil Consumption, due to Part Load Operation and Multiple Start/Stop of Units as per IEGC (4th Amendment) Regulations 2016

 Deviation Settlement Account for the week 040716-100716(Week-15/2016-17)

 Reactive Energy Account for the week 040716-100716(Week-15/2016-17)

 RRAS Account for the week 040716-100716(Week-15/2016-17)

 Deviation Settlement Account for the week 270616-030716(Week-14/2016-17)

 Reactive Energy Account for the week 270616-030716(Week-14/2016-17)

 RRAS Account for the week 270616-030716(Week-14/2016-17)

 Deviation Settlement Account for the week 200616-260616(Week-13/2016-17)

 Reactive Energy Account for the week 200616-260616(Week-13/2016-17)

 RRAS Account for the week 200616-260616(Week-13/2016-17)

 Amendment-1 of Provisional REA for the month of June, 2016

 Revision-I of Regional Transmission Account for the month of June, 2016

 Provisional REA for the month of June, 2016

 Regional Transmission Account for the month of June, 2016

 Final REA for the month of April, 2016

 Corrigendum to RRAS Account for the week 110416-170416(Week-03/2016-17)

 Details of RRAS Providers

 Corrigendum to Deviation Settlement Account for the week 07th to 13th September 2015(Week-24/2015-16)

General
 Pre-Bid conference of tender for AMC of Energy Accounting and other software

 Tender for Annual Maintenance Contract (AMC) of Energy Accounting and other software in Northern Regional Power Committee (NRPC), New Delhi

 Allocations from CGSs (Allocation No-05/2016-17 w.e.f 00:00 hrs of 14.07.2016)

 Anticipated Power Supply Position for FY 2016-17.

 Minutes of meeting to discuss the issues related to Delhi Islanding Scheme held on 29.10.2015.

 Format for Planned Annual Maintenance Programme of Transmission Elements for 2016-17

  Report of Group of Experts on UPPTCL SEM Vs SCADA data variation

 Extension of Dates for Submission of bids for Capacity Building Programmes on the Integration of Renewable Energy Resources (RES) into the Grid

 Yearly Power Supply Position for 2015-16

 Capacity Building Programmes on the Integration of Renewable Energy Resources (RES) into the Grid

 Report of the Basic Protection Audit Carried out by POWERGRID in association with CPRI.

 Procedure for Transmission element outage planning in Northern Region.

 Formats for submitting Dynamic data of Generator Models required in PSS®E for Simulations

 Final List of Transmission Lines with transmission code used in Transmission Elements Planning Software

 Level of pollution in the areas studied by CPRI for Pollution Mapping Project

 Draft Protocol/guidelines for patrolling of Transmission Line

 Guidelines for testing of UFR

 Formats for submitting CT failure data for last 05 years

 Outage planning Procedure devised by NLDC.

Disclaimer    Search   Location Map


Visitor Count
w.e.f. 01.04.2010
Northern Regional Power Committee
18-A, Qutab Institutional Area, Shaheed Jeet Singh Marg
Katwaria Sarai, New Delhi-110 016
EPABX No. 011-26967842/26868681/26567341 Fax 011-26865206
© Northern Regional Power Committee